July, 2007

The picture at left is taken looking directly East from the West Wing along the Promenade and may help clarify the previous two pictures. At the far end of the Promenade is the entrance to the Master Suite. In the foreground at left is the Stairway and at right is the door to the Powder Room. Further along are the steps coming down from the Entry toward the Great Room. Beyond that on the left is the "window" to Gary's office and on the right is the half wall (barely visible). Finally, before the Master Suite is the Library (some shelves are barely visible to the left of the arched doorway).

Major things for next month are: finishing the oak flooring, tile for the Entry, completion of the HVAC systems, installation of plumbing fixtures, installation of Kitchen appliances, and regrading of the area immediately surrounding the Main House. Unless there are significant problems, we should be ready to move in during the first or second week of September.