The picture at left is taken looking directly East from the
West Wing along the Promenade and may help clarify the
previous two pictures.
At the far end of the Promenade is the entrance to the
Master Suite.
In the foreground at left is the Stairway and at right is
the door to the Powder Room.
Further along are the steps coming down from the Entry
toward the Great Room.
Beyond that on the left is the "window" to Gary's office and
on the right is the half wall
(barely visible).
Finally,
before the Master Suite is the Library
(some shelves are barely visible to the left of the arched
doorway).
Major things for next month are:
finishing the oak flooring,
tile for the Entry,
completion of the HVAC systems,
installation of plumbing fixtures,
installation of Kitchen appliances,
and regrading of the area immediately surrounding the Main
House.
Unless there are significant problems,
we should be ready to move in during the first or second
week of September.