Some Finishing Touches

Septic System

The septic holding tank nestles into the slope east of the building. The effluent will be pumped up over the ridge and into a drain field below the Main House. Hopefully, the plumbing will be working by the time Gary makes a visit planned for December 15.

 

The Kitchen

The walls have been painted, some trim installed and the cabinets are going in.