18 Nov 2005 Granite counters arrive. Costa Esmeralda granite is from Costa Rica. The general coloration is compatible with our sage green theme; the white stripes are a natural feature of the rock. |
18 Nov 2005 Delicate carpentry is needed for these big timbers. (1 MB movie) |
20 Nov 2005 The fire one week later. Here is what it looked like the day we started it. It will probably continue to smolder for another week. |
|---|---|---|
|
22 Nov 2005 Pouring the lowest (Media Room) patio. It will be colored, textured and cut to match the others. Note the "earthy" color scheme, including the stucco. |
22 Nov 2005 The fireplace (it's not as green as the picture suggests) |
22 Nov 2005 First of the wood floor goes down in the library. The floor is random width red oak planks. Note the library shelves and the window seat. |
|
22 Nov 2005 Ceiling in the West Wing Bedroom |
22 Nov 2005 Roofing is on the spark arrestors, snow guards are being installed and the temporary landscaping (i.e., ditches and gravel) is going in. |
28 Nov 2005 The upper drive was in such bad shape that the workmen had to park at the Carriage House and walk up to the Main House while we worked on clearing snow. |
|
30 Nov 2005 Spa tub for the Master Suite arrives. Note the cornice on the roof. |
30 Nov 2005 The west half of the Library. |
30 Nov 2005 One end of the oblate spheroid ceiling; the elliptical shape and "Mt. Rainier Gray" color give it the appearance of great depth (height?). |