03 Jan 2007 – SSW Adam and Lars contemplate their work on the Entry roof. |
05 Jan 2007 – N Underside of the Entry structure looking out the front door, showing the tongue and groove ceiling. |
05 Jan 2007 – S The Entry structure, looking into the front door. The Entry slab will come up to the base of the timber pillars. |
|---|---|---|
|
05 Jan 2007 – WSW Phil and Brian work on the rafters for the Master Bedroom patio at the East end of the house. The patio surface will come up to the base of the timber knee braces. |
05 Jan 2007 – S Detail of the eave trim, with fascia still to be added. The soffit is tongue and groove. The small block in the timbers that support the rafters is a tenon to join two timbers that have open mortises. |
08 Jan 2007 – E 12"x15" timber separating the Great Room from the Dining Room. A 12"x18"x26' timber will sit on top of it and provide most of the structural strength; until then the attached 2"x10" planks make sure the notch in the 12"x15" beam does not split. |
|
08 Jan 2007 – SW Working on the roof at the southeast corner. |
13 Jan 2007 – S Same picture as above, with fascia. |
22 Jan 2007 – S Yesterday the roof was covered with snow. We worked hard to clear it so the roofers could get started today. Sun, wind and warmer temperatures dried out even the North side of the roof. |
|
23 Jan 2007 – S The first metal panels are applied to the East end of the roof. Pauline stands by the machine that makes the panels. |
25 Jan 2007 – S The North roof is done, a job that previously was not finished until August of 2005 due to the difficulties of stabilizing the piers that support the Entry structure. Snow guards are also on, so we won't have to worry about snow sliding off and injuring someone. The South side of the roof is still waiting for large timbers to be placed. |
25 Jan 2007 – NNE Three furnaces in the 2nd Utility Room. Duct work will start soon. |
|
26 Jan 2007 – SW Lifting the first large (12"x18"x26’) timber for the Great Room. |
26 Jan 2007 – N Same timber, looking North. |
26 Jan 2007 – SW Unlike last time, the timbers intersect as they should. |
|
26 Jan 2007 – NE Phil directs the crane operator as the last large timber is placed. |
26 Jan 2007 – N The four large timbers are now in place over the Great Room, a task previously completed May, 2005. |
31 Jan 2007 – N We'll see if the wind and sun take care of the snow on the roof! |