05 Jun 2007 – NE
Master Bedroom ceiling with the first coat of paint. The recessed part is a darker blue than the shelf. Compare this to May 7 and May 31. Note that the doorway into the bath has a semi-elliptical arch.

05 Jun 2007 – SW
The mason starts on the fireplace.

05 Jun 2007 – SW
Another mason starts on the exterior wall.

07 Jun 2007 – NW
The snow level stopped 200' above us last night.

13 Jun 2007 – NE
Finish carpenters Robb and Dan work on the tongue and groove ceiling.

14 Jun 2007 – S
The Great Room ceiling is finished.

14 Jun 2007 – NW
Pauline contemplates the Master Bath shower. We should see some tile on it soon.

18 Jun 2007 – E
Pocket door from the Kitchen to the (you probably guessed) Pantry.

18 Jun 2007 – SSE
Trim on one of the West Bedroom windows.

25 Jun 2007 – NE
Library shelves being installed.

25 Jun 2007 – NW
Library shelves being installed. Holes are for power and networking.

25 Jun 2007 – NW
Master Bath shower tile in progress. Tile on the floor is covered to protect it.

26 Jun 2007 – S
The Garage roof needed a partial do-over.

27 Jun 2007 – E
Stucco color at the West end. The lower levels will be darker.
 