05 Jun 2007 – NE Master Bedroom ceiling with the first coat of paint. The recessed part is a darker blue than the shelf. Compare this to May 7 and May 31. Note that the doorway into the bath has a semi-elliptical arch. |
05 Jun 2007 – SW The mason starts on the fireplace. |
05 Jun 2007 – SW Another mason starts on the exterior wall. |
|---|---|---|
|
07 Jun 2007 – NW The snow level stopped 200' above us last night. |
13 Jun 2007 – NE Finish carpenters Robb and Dan work on the tongue and groove ceiling. |
14 Jun 2007 – S The Great Room ceiling is finished. |
|
14 Jun 2007 – NW Pauline contemplates the Master Bath shower. We should see some tile on it soon. |
18 Jun 2007 – E Pocket door from the Kitchen to the (you probably guessed) Pantry. |
18 Jun 2007 – SSE Trim on one of the West Bedroom windows. |
|
25 Jun 2007 – NE Library shelves being installed. |
25 Jun 2007 – NW Library shelves being installed. Holes are for power and networking. |
25 Jun 2007 – NW Master Bath shower tile in progress. Tile on the floor is covered to protect it. |
|
26 Jun 2007 – S The Garage roof needed a partial do-over. |
27 Jun 2007 – E Stucco color at the West end. The lower levels will be darker. |